Arab Potash Company, Safi Jordan
10005_Small_Arab_Potash_Co_bar63

Arab Potash Company, Safi Jordan

Boiler type: SteamGen™ 4
Steam data:  110 t/h, 63 bar, 487 °C

In February 2003 Aalborg Engineering signed a contract with the Arab Potash Company to supply a heavy fuel oil fired water tube package boiler for the Safi plant in Jordan. The boiler will replace a more than 20 year old O-type boiler and produce superheated steam for the steam turbine and for use in the process.

The contract covers design, procurement, production, erection and commissioning of a complete package boiler with burners and soot blowers.


Project data:

Client: Arab Potash Company
Location: Safi, Jordan
Year of commisioning: 2004
Boiler: SteamGen™ 4
Steam capacity: 110 t/h
Steam pressure: 63 bar
Steam temperature: 487 °C

Scope of supply

  • Water tube package boiler
  • Heavy fuel oil burners
  • Heavy fuel oil preheater
  • Heavy fuel oil valve train
  • Combustion air fan
  • Economiser
  • Flue gas ducts
  • Drain, vent and blowdown system
  • Valves and instrumentation
  • Burner management system
  • Soot blowers
  • Soot blower control panel
  • Erection
  • Commissioning

Client: