| Tupras Refinery Izmir |
Tupras Izmir Refinery suffered badly from a boiler explosion and has decided to replace the installation with a SteamGen 8. The new HRSG will be producing steam from the exhaust of a new Siemens SGT 600, supplementary firing and fresh air firing in case of GT failure.This new installation will be supporting the refinery for decades with steam. Project data:
Scope of supply
HP economiser 1+2 HP evaporator HP super heater 1+2+3 LP steam drum LP economiser LP evaporator LP super heater Water cooled furnace HP spray type desuperheaters Drain and vent system incl. blow-down tank HP feed water booster pumps Chemical dosing units for LP and HP steam drums Burner system for supplementary-/fresh air fired on natural gas Internal piping and valves Flue gas recirculation Inlet duct Outlet duct / Stack Steel structures and access ways Field instruments Signal cables from field instruments/valves to junction boxes Heat tracing incl. distribution panel Transport Installation Commissioning & testing at site