| Age Denizli Dogalgaz Elektrik Üretim, Turkey |
Boiler type: SteamGen™ 8
|
| Steam data: 43 t/h, 54 bar, 425 °C |
Age Denizli Dogalgaz Elektrik Üretim is an independent Power Producer Company. The project is to develop, build and commercially start-up a Combined Cycle Power Plant with an estimated installed capacity of 200 MW. The Generation License has already been obtained from Energy Market Regulatory Authority. Reservations for natural gas and tie-in with the grid at 154 kV level has been done. The project will be executed in two phases. The plan will be put into commercial operation on Simple Cycle mode at the first stage while erection works of the HRSG, ST and ACC will be progressing for the second stage. On completion of the commissioning works on the steam Cycle side then the plan will be combined with the steam generation for full load operation. The plant is located in Gerali, Saraykoy, Denizli in the Agean Region of Turkey. The AE scope of supply is three (3) identical HRSG SteamGen 8 and one (1) common feedwater system.
Project data:
| Client: |
AGE Denizli Dogalgaz Elektrik Üretim A.S. |
| Location: |
Izmit, Turkey
|
Year of commisioning:
|
2012 |
| Gasturbine: |
GE LM6000
|
| Boiler: |
SteamGen™ 8
|
| HP Steam capacity: |
43 t/h
|
| HP Steam pressure: |
50/5 bar |
| HP Steam temperature: |
425 °C |
| LP steam capacity: |
16.5 t/h
|
| LP steam pressure: |
3 bar
|
| LP steam temperature: |
220 °C
|
Scope of supply
- HP circuit incl. SH 1+2+3, EVAP, ECO 1+2, steam drum
LP circuit incl. SH 1+2, EVAP, ECO, steam drum HP & LP stand-by heating system HP spray type desuperheaters (nozzle/control valve built together) Drain and vent system including piping valves, headers, flash tank and blow-down tank HP & LP chemical dosing units for injection of NaOH to steam drums HP/LP water/steam sampling system (boiler water, saturated steam, superheated steam) Internal piping and valves Inlet duct/diffuser including expansion joint Outlet duct and stack (outlet 35 m above ground) Stack damper (for heat preservation) Steel structures and access ways Field instruments (safety: 2oo3, control: 1oo2, local: 1oo1) Signal cables from field instruments to junction boxes Heat tracing incl. distribution panel Emergency shutdown panel with fail safe PLC. Lagging and cladding Delivery to site, DDU Incoterms 2000 Installation supervisor Commissioning & testing supervisor
Client: |