Siemens Plovdiv
AE_Job_Logo
Siemens Industrial Turbomachinery AB - Plovdiv, Bulgaria
Boiler type: SteamGen™ 8
Steam data:  75 t/h, 82,5bar, 511 °C

 

Space is a limitation in many indoor Combined Heat and Power Plants. This was also the case in Plovdiv. The smart solution var to place the HRSG on top of the gas turbine. As the end user EVN,the contractor Siemens Sweden and Aalborg Engineering could accept the arragement this became the logic for this project.Teh SteamGen 8 was selected and with its water cooled combustion chamber the capacity was reaced without any limits of the desing.

.

All equipment is purchased in various countries by Aalborg Engineering and the erection work is carried out by a subcontracted Turkish company.

Project data:

Client: Siemens Industrial Turbomachinery AB, Plovdiv
Location: Plovdiv, Bulgaria
Year of commisioning:
2011
Gasturbine: Siemens SGT 700
Boiler: SteamGen™ 8
HP Steam capacity: 75 t/h
HP Steam pressure: 82,5 bar
HP Steam temperature: 511 °C
LP steam capacity:  
LP steam pressure:  
LP steam temperature:

Scope of supply

  • Natural circulation, dual-pressure HRSG
  • Steel structure, platforms and stairways
  • Flue gas duct and stack
  • Boiler feed pumps
  • Steam system
  • Steam turbine bypass PRDS
  • Drain, vent and blowdown system
  • Chemical dosing system
  • Water & steam sampling and analysis system
  • Valves and instrumentation
  • Instrument cable installation
  • Electrical trace heating
  • Motor control centre
  • Erection
  • Commissioning

Client: