Cebi Enerji - Marmara Ereglisi, Turkey
Cebi_Enerji-Marmara_Ereglisi_Turkey
Cebi Enerji - Marmara Ereglisi, Turkey
Boiler type: SteamGen™ 8
Steam data: 60 t/h, 79 bar, 510 °C
In November 2003 Aalborg Engineering signed a contract with Cebi Enerji to supply the HRSG for a new established natural gas fired combined cycle power plant in Marmara Ereglisi, Turkey. The contract period commence in April 2004.

The contract covers design, procurement, production, erection and commissioning of a complete dual-pressure HRSG plant.

All equipment is purchased in various countries by Aalborg Engineering and the erection work is carried out by a subcontracted Turkish company.

Project data:

Client: Cebi Enerji
Location: Marmara Ereglisi, Turkey
Year of commisioning: 2005
Gasturbine: Siemens GTX100
Fuel: Natural gas and refinery gas
HP Steam capacity: 60 t/h
HP Steam pressure: 6 bar
HP Steam temperature: 219 °C
LP Steam capacity: 12 t/h
LP Steam pressure: 6 bar
LP Steam temperature: 219 °C

Scope of supply

  • Natural circulation, dual-pressure HRSG
  • Steel structure, platforms and stairways
  • Flue gas ducts and stack
  • Deaerator
  • Boiler feed pumps
  • Condensate system
  • Steam system
  • Drain, vent and blowdown system
  • Chemical dosing system
  • Water & steam sampling system
  • Valves and instrumentation
  • Electrical trace heating
  • Motor control centre
  • Boiler control system
  • Erection
  • Commissioning

Client: