| Siemens - Inesco CHP, Belgium |
Boiler type: SteamGen™ 8
|
| Steam data: 118 t/h, 76 bar, 502 °C |
In March 2004 Aalborg Engineering signed a contract with Siemens Nederland to supply 2 HRSGs for the end user Essent Energie's new Inesco CHP plant in Zwijndrecht, Belgium.
The contract covers design, procurement, production, erection and commissioning of 2 complete dual-pressure HRSG plants with supplementary firing systems and feedwater systems.
Project data:
| Client: |
Siemens Nederland N.V.
|
| Location: |
Essent Energie B.V. |
| Year of commisioning: |
2005 |
| Gasturbine: |
Siemens GTX100
|
| Boiler: |
SteamGen™ 8
|
| HP Steam capacity: |
118 t/h
|
| HP Steam pressure: |
76 bar |
| HP Steam temperature: |
502 °C |
| LP steam capacity: |
11 t/h |
| LP steam pressure: |
5 bar |
| LP steam temperature: |
287 °C
|
Scope of supply
- Natural circulation, dual-pressure HRSG
- Steel structure, platforms and stairways
- Flue gas duct, silencer and stack
- Duct burner and gas train
- Deaerator
- Boiler feed pumps
- Condensate system
- Steam system
- Drain, vent and blowdown system
- Chemical dosing system
- Water & steam sampling and analysis system
- Valves and instrumentation
- Instrument cable installation
- Electrical trace heating
- Burner management system
- Erection
- Commissioning
Client: |